TSX-V: GORO
San Francisco

San Francisco Project

A large-scale, past-producing open-pit gold mine in Sonora, Mexico, 100%-owned and restart-ready, with 1.23 million ounces of Measured & Indicated gold.

Restart-ready · targeting 2027
Overview

A restart-ready Sonoran gold mine

Acquired 100% in June 2026 through the purchase of Molimentales del Noroeste, the San Francisco Project is a large-scale, formerly-producing open-pit gold mine located approximately 150 kilometres north of Hermosillo, Sonora. The property comprises 13 concessions totalling 33,667 hectares, plus 13,284 hectares of regional concessions, and hosts a mesothermal gold deposit across two former pits, San Francisco and La Chicharra, with further upside in the North Pit and Llano extensions. Installed infrastructure includes 16,875 tpd of crushing capacity, twin ADR plants, grid power and haul roads contiguous with the highway, pointing to a low-capital restart producing gold doré with potential output of 50,000–60,000 ounces of gold-equivalent per year.

Sonora, Mexico · ~150 km north of Hermosillo
100%
Ownership
33,667 ha
Concessions
1.23 Moz
M&I gold
50–60k oz/yr
Potential output
16,875 tpd
Processing
Open pit
Mine type
7 yrs
Possible LOM
2027
Targeted restart
Resource

Mineral Resource Estimate

Independent NI 43-101 mineral resource estimate with an effective date of April 30, 2026.

Measured & Indicated
1.23Moz
contained gold @ 0.36 g/t Au
+178 Koz
Inferred (additional)
Measured582 KozIndicated645 Koz
CategoryTonnes (Kt)Grade (g/t Au)Gold (Koz)
Measured48,2650.37581.7
Indicated56,8210.35644.9
Measured & Indicated105,0860.361,226.6
Inferred17,2680.32178.4

Effective date April 30, 2026. Break-even cut-off grades range 0.10–0.12 g/t Au; marginal cut-off grades 0.07–0.09 g/t Au depending on pit. Qualified Persons: William J. Lewis, P.Geo.; Richard M. Gowans, P.Eng.; Tudorel Ciuculescu, P.Geo. Mineral resources are not mineral reserves and do not have demonstrated economic viability. The Company has not made a production decision on San Francisco; references to production potential are conceptual, and any restart decision made without established mineral reserves and a completed feasibility study carries a higher risk of economic or technical failure.

Infrastructure

The mine complex

San Francisco is a built mine, not a greenfield prospect. Open pits, crushing circuits, gold-recovery plants and supporting infrastructure are already on the ground, underpinning a low-capital path back to production.

The San Francisco open pit, Sonora
The San Francisco open pit, Sonora

All infrastructure in place for a cost-effective, timely restart:

San Francisco open pit
La Chicharra open pit
North Pit & Llano extensions
16,875 tpd crushing capacity
Twin ADR gold-recovery plants
Grid power & on-site wells
ROM & crushed-ore pads
Assay lab & workshops
Haul roads to the highway
Highlights

Why San Francisco

Large-scale upside

A large-scale project with significant upside potential and multiple exploration targets.

Two former pits

Two pits, San Francisco and La Chicharra, were in operation, hosting large-volume disseminated gold deposits.

Infrastructure in place

Heap-leach processing facilities and associated infrastructure are already in place for a cost-effective, timely restart.

Resource upside

Resource upside with multiple high-priority exploration targets identified across the concession package.

Path forward

The road to restart

A staged plan advances San Francisco from technical work today toward full gold production, leveraging infrastructure already in place.

2026
Drill & confirm

24,000 m diamond drilling to optimize the mine plan.

Late 2026
Refurbish plant

Crushing circuit & ADR plant readied for production.

Q1 2027
Restart mining

Mining recommences across the open pits.

H2 2027
Full production

Ramp to full output and gold doré.

~US$8.5M
Drilling & definition
~US$15M
Plant refurbishment
US$40–50M
Estimated production working capital